Africa Ferry
All vessels

Transporter · Preliminary concept

SHUTTLE 15

A configurable aluminium passenger and cargo transporter with shallow draft, a 54-person total complement and two documented twin-outboard options.

Includes a distinct configuration with complete specifications and imagery.

SHUTTLE 15 supplied vessel render

Vessel render

Length

12.3 m

Beam

4.39 m

Total complement

54

Note: The model name states 15, while the specification states a 12.3 m length overall.

Specification

Technical particulars

Hull
Aluminium, semi-displacement
Superstructure
Aluminium
Length overall
12.3 m
Beam overall
4.39 m
Maximum displacement
11.73 t, full load
Maximum draft
0.47 m
Classification target
CE, BV

On board

Capacities

Fuel
587 L
Fresh water
1,350 L
Waste water
378 L
Total complement
54 persons
Endurance basis
1 day

Performance

Propulsion options

2 × 100 hp

Arrangement
Outboard
Installed power
200 hp
Maximum speed
14.5 kn
Cruise speed
11.5 kn
Fuel burn at cruise
33 L/h
Range at cruise
185 nm
Estimated displacement
11.54 t

2 × 200 hp

Arrangement
Outboard
Installed power
400 hp
Maximum speed
15.5 kn
Cruise speed
15 kn
Fuel burn at cruise
66 L/h
Range at cruise
120 nm
Estimated displacement
11.73 t

Deck configuration

The principal particulars, capacities, propulsion and systems shown above use the complete configuration for this model.

Systems

Electrical

Power supply
230 VAC, 24 VDC
House battery, recommended
2,940 Ah
Genset
4.6 kW / 5.7 kVA
Air conditioning
Approx. 10,000 BTU/h

Navigation & equipment

12-inch MFD, VHF DSC, AIS-B, radar with 18/24-inch dome, autopilot and 600 W sonar. Masthead, stern and side lights, magnetic compass, sound signal device, VHF radio, flares and navigation charts.

Gallery

SHUTTLE 15 gallery image 1SHUTTLE 15 gallery image 2SHUTTLE 15 gallery image 3SHUTTLE 15 gallery image 4SHUTTLE 15 gallery image 5SHUTTLE 15 gallery image 6SHUTTLE 15 gallery image 7

Status

Development status

This preliminary concept record is preliminary and subject to detailed engineering and final configuration.

Downloads

Discuss SHUTTLE 15

Start with your route, capacity and operating requirements.

Enquire about this vessel